Skip to content

What are you looking for?

Accès Condos projects (all sold)

Discover the Accès Condos projects completed between 2005 and 2019 (all units have been sold)

Cité l’Acadie (2)

SOLD – A large-scale mixed project in Ahuntsic-Cartierville

All Accès Condos projects completed between 2005 and 2019 have been sold. Our team is actually working on new version of the program.

Phase 2 of Cité l’Acadie comprises 237 condominiums – 192 were Accès Condos accredited – ranging from one-bedroom to three-bedroom units. The sixteen-storey building, whose construction was completed in 2012, is located on Place de l’Acadie, in the immediate vicinity of Highway 15 in the Ahuntsic-Cartierville borough. With the construction of Phase 1 a year before, Cité l’Acadie now encompasses 423 Accès Condos accredited dwellings.

Read about the Phase 1

Cité l’Acadie (1)

SOLD – A large-scale mixed project in Ahuntsic-Cartierville

All Accès Condos projects completed between 2005 and 2019 have been sold. Our team is actually working on new version of the program.

Phase 1 of Cité l’Acadie comprises 231 condominiums ranging from studios to three-bedroom units. The twelve-storey building, whose construction was completed in 2011, is located on Place de l’Acadie, in the immediate vicinity of Highway 15 in the Ahuntsic-Cartierville borough. With the construction of its Phase 2 a year later, Cité l’Acadie now encompasses 423 Accès Condos accredited dwellings.

Read about the Phase 2

Le Novello 2

SOLD – A major project encompassing 226 condos in the heart of Saint-Léonard

All Accès Condos projects completed between 2005 and 2019 have been sold. Our team is actually working on new version of the program.

Completed in 2009, Le Novello 2 comprises 2 eleven-storey buildings for a total of 226 condos. With units ranging from one to three bedrooms, the project put the needs of families at the forefront with 23% of the condos designed with three bedrooms and 69% with two bedrooms. Given the enthusiasm of buyers at the launch of the initial project, this second phase was announced in September 2008. Located on Jean-Talon Street, near Viau Street and the heart of the borough of Saint-Léonard, Le Novello 2 stands out for its contemporary architecture.

Read about the Phase 1

Le Novello

SOLD – 153 Accès Condos accredited condominiums in the heart of Saint-Léonard

All Accès Condos projects completed between 2005 and 2019 have been sold. Our team is actually working on new version of the program.

Le Novello, whose construction was finalized in 2008, encompasses 153 condos ranging from studios to three bedroom units. The ten-storey building also has commercial spaces on the ground floor. Located on Jean-Talon Street, near Viau Street in the heart of the borough of Saint-Léonard, le Novello stands out for its contemporary architecture. A second phase was completed a year later.

Read about the Phase 2

Le MN2

SOLD – The second phase of a project for affordable condominiums in Montréal-Nord

All Accès Condos projects completed between 2005 and 2019 have been sold. Our team is actually working on new version of the program.

Located at the gateway to the Montréal-Nord borough and completed in 2013, Le MN2 includes 62 condo units of one, two and three bedrooms on two levels. The project was completed within a year after the delivery of Phase 1. The six-storey building has architectural and functional characteristics similar to that of its parent project. The integration of small townhouses on two floors, each with a main entrance at street level, creates a living environment with a truly human scale.

See the Phase 1

Faubourg Contrecoeur Phase 5

SOLD – 95 Accès Condos accredited condos where affordability and functionality go hand in hand

All Accès Condos projects completed between 2005 and 2019 have been sold. Our team is actually working on new version of the program.

The project, whose construction was completed in 2018 in the Mercier–Hochelaga-Maisonneuve borough, project offers 95 affordable condominium units featuring one to five bedrooms. There are 52 two-bedroom units, 22 three-bedroom, 18 one-bedroom, two four-bedroom and one five-bedroom. As whole, it comprises six floors with two elevators. Its contemporary design blends harmoniously with the surrounding built environment thanks to a play of subtle architectural volumetry. The contrast of the colours of the masonry brings character to the project. The full-height windows provide exceptional luminosity in each unit and many enjoy a view of the park Carlos D’Alcantara, located right in front of the project.

Read about the other phases: Phase 1 – Phase 2 – Phase 3 – Phase 4Phase 6